Drainage work on the 4th hole.
The 4th fairway has suffered all year with the continual rainfall. A combination of damaged drains, tree roots and issues with the outlet onto the shore have made the hole unplayable at times. The club have provided the funds to carry out improvements and the greenstaff have been busy installing new drain lines with perforated pipe and washed gravel. The 1st area to be trenched was close to the fairway bunkers. A large floating "cows belly" had appeared which indicated broken pipework below. A new 100mm pipe drain has been installed and connected into a servicable clay tile land drain (which was rodded). This area has dried out already and will improve even more when we dig a small extension drain to the area. The next area to be drained was closer to the tee, near the rear of the 16th green. Large quantities of water have been running across the surface from the R/H side of the fairway and rough. 2 problems were discovered, a spring and old land drains damaged by tree...