Course Update
Despite the prolonged wet weather, work has continued to move forward on the course and with the recent dry weather set to continue, we plan to start tidying and fininshing off the drainage and tree removal. The creation of the mounding and pond alterations on the 2nd hole are nearly ready for seeding. The top soil just needs spreading and raking off. The fescue grasses should look amazing and provide a much improved feature next to the green. The drainage work next to the 3rd green is ready for topping up with rootzone and the frosty forecast will allow this to happen. This area will still take a while to dry out as the amount of roots is hampering the flow of water thru the soil profile. The drains on the 4th hole will also be topped up. Seeding will take place when the rootzone has setttled and the temperatures warm up. The large tree roots have been removed on the 4th, 5th, 12th & 16th, but there is still a fair amout of repair work to complete before these areas ar